![]() |
Brand Name: | SISLAISHI |
Model Number: | 300 Series |
MOQ: | 1 Ton |
Price: | Negotiable |
Delivery Time: | 7-14 days |
Payment Terms: | T/T, Western Union |
Material
|
201,304,304L,316,316L,309S,310S,321,
410,420,430,904L,2205,2507,ect |
Surface
|
NO.1/BA/2B/NO.4/8K/HL
|
Standard
|
ASTM,AISI,JIS,GB,EN,DIN,GB
|
Application
|
Building/commercial/industrial
|
Thickness
|
0.3-100mm or as requeted
|
Payment terms
|
T/T L/C or negotiation
|
Width
|
1000mm, 1219mm, 1250mm, 1500mm,or as customer's request
|
Delivery time
|
within 7-15 working days or according to the quantity
|
Length
|
2000mm,2438mm,3000mm,6000mm,or as as customer's request
|
Package
|
With wooden pallets, Standard Sea Worthy Package or as customer's request
|
Surface:
Surface Finish | Defination | Application |
2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry.Construction material, Kitchen utensils. |
BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe. |
HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building construction. |
8K | The product have excellent brightness and prefect reflexivity can be the mirror. | Mirror. |
Related products:
Production Process:
Trade Terms |
EXW, FOB, CIF, CRF, DAP |
MOQ |
1 Ton |
Payment terms | 1).30% deposit, the balance before loading by T/T 2).30% deposit, the balance against copy of B/L by T/T 3).30% deposit by T/T, the balance by L/C at sight 4).100% L/C at sight |
Lead time |
7~14 days after get deposit or origin L/C document |
OEM Service:
Packaging & Shipping
Tensile Strength | Yield Strength | Elongation | Hardness | |
(MPa) | 0.2% Proof (MPa) | (% in 50mm) | Rockwell B | Brinell |
(HR B) | (HB) | |||
515 | 205 | 40 | 92 | 201 |
515 | 205 | 40 | 90 | 187 |
515 | 205 | 40 | 92 | 201 |
FAQ:
Q1. Where is your factory ?
A1: Our company's processing center is located in Jiangsu, Wuxi, China.
Which is well equipped with kinds of machines, such as laser cutting machine,mirror polishing machine and so on.
We can provide a wide range of personalized services according to the customers' needs.
![]() |
Brand Name: | SISLAISHI |
Model Number: | 300 Series |
MOQ: | 1 Ton |
Price: | Negotiable |
Packaging Details: | Standard seaworthy package |
Payment Terms: | T/T, Western Union |
Material
|
201,304,304L,316,316L,309S,310S,321,
410,420,430,904L,2205,2507,ect |
Surface
|
NO.1/BA/2B/NO.4/8K/HL
|
Standard
|
ASTM,AISI,JIS,GB,EN,DIN,GB
|
Application
|
Building/commercial/industrial
|
Thickness
|
0.3-100mm or as requeted
|
Payment terms
|
T/T L/C or negotiation
|
Width
|
1000mm, 1219mm, 1250mm, 1500mm,or as customer's request
|
Delivery time
|
within 7-15 working days or according to the quantity
|
Length
|
2000mm,2438mm,3000mm,6000mm,or as as customer's request
|
Package
|
With wooden pallets, Standard Sea Worthy Package or as customer's request
|
Surface:
Surface Finish | Defination | Application |
2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry.Construction material, Kitchen utensils. |
BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe. |
HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building construction. |
8K | The product have excellent brightness and prefect reflexivity can be the mirror. | Mirror. |
Related products:
Production Process:
Trade Terms |
EXW, FOB, CIF, CRF, DAP |
MOQ |
1 Ton |
Payment terms | 1).30% deposit, the balance before loading by T/T 2).30% deposit, the balance against copy of B/L by T/T 3).30% deposit by T/T, the balance by L/C at sight 4).100% L/C at sight |
Lead time |
7~14 days after get deposit or origin L/C document |
OEM Service:
Packaging & Shipping
Tensile Strength | Yield Strength | Elongation | Hardness | |
(MPa) | 0.2% Proof (MPa) | (% in 50mm) | Rockwell B | Brinell |
(HR B) | (HB) | |||
515 | 205 | 40 | 92 | 201 |
515 | 205 | 40 | 90 | 187 |
515 | 205 | 40 | 92 | 201 |
FAQ:
Q1. Where is your factory ?
A1: Our company's processing center is located in Jiangsu, Wuxi, China.
Which is well equipped with kinds of machines, such as laser cutting machine,mirror polishing machine and so on.
We can provide a wide range of personalized services according to the customers' needs.